Nortec ASD Manuel d'utilisateur Page 1

Naviguer en ligne ou télécharger Manuel d'utilisateur pour Composants des dispositifs de sécurité Nortec ASD. Nortec ASD User's Manual Manuel d'utilisatio

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 12
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 0
STEAM
DISTRIBUTORS
ASD / BSD / CSD
Steam Distribution
Installation Manual
IMPORTANT: Read and save this guide for future
reference. This guide to be left with equipment owner.
1506117-B
Vue de la page 0
1 2 3 4 5 6 ... 11 12

Résumé du contenu

Page 1 - Installation Manual

STEAMDISTRIBUTORSASD / BSD / CSDSteam DistributionInstallation ManualIMPORTANT: Read and save this guide for futurereference. This guide to be left wi

Page 2 - Table Of Contents

-8-ASD & BSD1506162- Distributor End Cap AssemblyCSD1506164 - Distributor End Cap AssemblyDistributor CoreExploded ViewsDecember 18, 2002ASD &

Page 3 - INSTALLATION

LIMITED WARRANTYWalter Meier Inc. and/or Walter Meier Ltd. (hereinafter collectively referred to asTHE COMPANY), warrant for a period of one year from

Page 4 - Drain Tee

Walter Meier (Climate USA) Inc.826 Proctor Avenue, Ogdensburg, New York 13669Walter Meier (Climate Canada) Ltd.2740 Fenton Road, Ottawa, Ontario K1T3T

Page 5 - Figure #2

Table Of ContentsINSTALLATION ...1RECEIVING & UNPACKING EQUIPMENT ...1PRE-INSTALLATION...

Page 6 - Vertical Airflow

INSTALLATIONRECEIVING & UNPACKING EQUIPMENT1. Check packing slip to ensure ALL materialhas been delivered.2. All material shortages are to be repo

Page 7 - Horizontal Airflow

Chart #3Recommended Condensate line at distributor(s)CONDENSATE RETURN GUIDELINES FORMAIN STEAM LINES1. Use vertical condensate leg of distributoronly

Page 8 - Min. W = 8” (203 mm)

-3-NHB, NHP, NHMC,RESDELUX ONLYTo be 2” (50mm) longerthen duct static pressureor minimum.To be 2” (50mm) longerthen duct static pressureor minimum.6”m

Page 9 - Use self tapping screws

-4--45ºGO TO123C2+45º1xBAlways align distributor holes so that steam is dischargedupwards to ensure condensate will remain in the distributor.Figure #

Page 10 - ASD & BSD

-5-C1DGO TO¿3.6 mm81-...81-...61-...41-...43mm61mm61-... / 41-...¿3.6mm81-...61-.../41-...HXXMin. HMin.ASD3” (76mm)BSDCSDASD ø 1.7" (43 mm)BSD ø

Page 11 - LIMITED WARRANTY

-6-C2DGO TOAlways align distributor holes so that steam is dischargedupwards to ensure condensate will remain in the distributor.H1/3W2/3WW1/3W1/3W1/3

Page 12

-7-#10 Sc rewUse self tapping screws.GO TOEDFigure #6Distributor Mounting - Horizontal & Vertical FlowE5/16”5/16” uncSupport Bracketby OthersManda

Commentaires sur ces manuels

Pas de commentaire